Bring together relevant records from municipalities, utility owners, survey teams, and project specialists.
Evaluate routes and locations against agreed criteria using a consistent analytical approach.
Maintain connected records as designs, observations, and asset information change.
Each of these is a scope a team has asked for. Yours is agreed with you before any work starts.
No. We analyze options using agreed criteria and available geographic information. The responsible engineering and project teams determine design requirements and the preferred approach.
Yes. We can organize supplied records and verified investigation results, documenting their sources and limitations. Records-based mapping does not establish excavation-ready utility locations.
Yes. We can deliver a defined GIS work package to the project’s data standards, templates, schedule, and review requirements.